PROJECT NARRATIVE
A BIOS was installed in one train as a pilot project and the local power supplier (APS) paid for half of the cost under an Energy Efficiency Incentive Scheme.
- Reduction of 15.3% was realized under BIOS control
- Payback period for the city is less than 1 year