In February 2004, the PADEP awarded Abington Township a Growing Greener Grant to partially fund a project to install a BIOS . This project included the purchase, installation and integration of the BIOS followed by a ~10 month monitoring period.
Read Case Study
After studying the positive effects the BIOS could have on the treatment process, the Town of Enfield commissioned a study to quantify the benefits of the BIOS.
Read Case Study
After studying the positive effects the BIOS could have on the treatment process, the Phoenix 23rd Ave Water Reclamation Facility commissioned a study to quantify the benefits of the BIOS.
Read Case Study
After reviewing a proposed expansion to the Sand Hill Road Water Reclamation Facility, BioChem Technology, Inc. recommended that a BIOS be installed as part of the new process to provide control of the dissolved oxygen and internal recycle systems.
Read Case Study
After reviewing a proposed expansion to the South Bermuda Water Reclamation Facility, BioChem Technology, Inc. recommended that a BIOS be installed as part of the new process to provide control of the dissolved oxygen and internal recycle systems.
Read Case Study